As PO I can drag stories to the end of a sprint

In the Product backlog when I drag a story, I can drop it to any position and the first story of sprint 2 is obviously the same position as the last story of sprint 1 as it depends on the recalculation of the SP anyway but POs are not generally engineers, so they shouldn't be charged with this isomorphism.

Status

Product Owner needs to review this Issue.

Comments

Post a comment



optional
optional