As PO I can drag stories to the end of a sprint
In the Product backlog when I drag a story, I can drop it to any position and the first story of sprint 2 is obviously the same position as the last story of sprint 1 as it depends on the recalculation of the SP anyway but POs are not generally engineers, so they shouldn't be charged with this isomorphism.
Status
Product Owner needs to review this Issue.